Training
WATTS
In-company training is provided to production, process, quality, and maintenance personnel for vegetable oil refining.
WATTS
In-company training is provided to production, process, quality, and maintenance personnel for vegetable oil refining.
AGD
Assistance is provided to detect vacuum issues in the bleaching unit for 350 TPD.
GENTE DE LA PAMPA
Remote and on-site assistance is provided to crushing, refining, and biodiesel production units.
ACHA
Verification and subsequent design of preheaters of water for boilers with stock oil are carried out to expand capacity to 4,100 TPD of sunflower seeds. Dimensions of dryers, ejectors, and pumps are also checked.
BUNGE
Redesign of the decanter for the enzymatic soapstock splitting unit is executed.
COFCO
Alternatives for improvements in the decanter area of the Saforcada sunflower line are proposed.
EXCEL GROUP
We carry out the sizing of steam and condensate lines for the implementation of a new DC for crushing unit of 7,500 TPD.
BUYATTI
Basic and detailed engineering is being carried out for the change of the refrigeration system from thermocompressors to a mechanical compressor, as well as for the inclusion of an economizer between the oil exiting the cold neutralization stage and the oil exiting the deodorization stage.
BUYATTI
We provided support for issues arising from the presence of waxes in refined sunflower oil.
COFCO
We validated the new Toaster installation for Extraction Line #1 and performed reforms on steam and condensate piping at the Saforcada complex in Buenos Aires province.
GENTE DE LA PAMPA
We evaluated tasks during the annual shutdown of the soybean crushing line in Catriló, La Pampa province.
RIS BIONUTRICION
We diagnosed problems with the vacuum unit on Deodorization Line #1 for 60 TPD.
VITERRA
We performed an annual performance audit for the crushing unit in Timbúes.
XXX
We analyzed the potential location for a new oil refining unit and determined the associated investment order, considering the process units, tank farm, and necessary service expansion.
AFA
We prepared a feasibility analysis and investment order for implementing sunflower seed processing, considering reception, pre-cleaning, conditioning, storage, pretreatment, pressing, gum separation, solvent extraction, degumming, lecithin drying, and all associated services.
CALSA
We evaluated the possibility of implementing energy integration to preheat boiler feedwater, using energy available in the semi-continuous deodorization unit at the Lanús Plant in Buenos Aires.
LDC
We studied the possibility of implementing a third reaction stage in Line #2 for 900 TPD of biodiesel, reusing existing equipment.
Comentarios